GB Mainline Signalling Part 2
Educational videos on railway signalling, as implemented on mainline railways in Great Britain. Following on from GB Mainline Signalling Part 1, available free-to-view at consiliumaquissulis.com/training, this Part 2 course explains the following topics through the medium of animation with voice-over:
- points locking,
- route locking,
- displaying a proceed aspect,
- approach locking,
- route release,
- directional controls,
- overlap locking,
- overlap detection,
- Time of Operation Locking,
- diamond crossings,
- trap protection,
- flank protection,
- reminder devices,
- technician's controls,
- signal groups.
-
GB Mainline Signalling Part 2, Module 1: Introduction (English)
Through the medium of animation with voice-over, this video introduces part 2 of Cōnsilium Aquīs Sulis's course on GB Mainline Signalling.
-
GB Mainline Signalling Part 2, Module 2: Points Locking (English)
Module 2 of GB Mainline Signalling Part 2: points locking.
Through the medium of animation with voice-over, this video covers the following topics:
- point key requests
- route locking of points
- points deadlocking
- foul track locking -
GB Mainline Signalling Part 2, Module 3: Route Locking (English)
Module 3 of GB Mainline Signalling Part 2: route locking.
Through the medium of animation with voice-over, this video covers the following topics:
- route requests
- testing points free to move
- testing opposing locking
- setting a route and applying route locking. -
GB Mainline Signalling Part 2, Module 4: Proceed Aspect (English)
Module 4 of GB Mainline Signalling Part 2: displaying a proceed aspect.
Through the medium of animation with voice-over, this video covers the following topics:
- displaying a proceed aspect for a route
- disengagement and automatic working
- automatic signals
- signal replacement. -
GB Mainline Signalling Part 2, Module 5: Approach Locking&Route Release(English)
Module 5 of GB Mainline Signalling Part 2: approach locking and route release.
Through the medium of animation with voice-over, this video covers the following topics:
- cancelling a route
- application of approach locking
- approach locking release
- sectional route release
- anti-bob protection. -
GB Mainline Signalling Part 2, Module 6: Directional Controls (English)
Module 6 of GB Mainline Signalling Part 2: directional controls.
Through the medium of animation with voice-over, this video covers the following topics:
- bi-directional lines
- establishing direction
- bi-directional automatic sections
- re-enforced locking. -
GB Mainline Signalling Part 2, Module 7: Overlap Locking (English)
Through the medium of animation with voice-over, this video covers the following topics:
- locking overlaps
- swinging overlaps
- release of overlaps
- phantom overlaps. -
GB Mainline Signalling Part 2, Module 8: Overlap Detection & TOOL (English)
Module 8 of GB Mainline Signalling Part 2: overlap detection and Time of Operation Locking.
Through the medium of animation with voice-over, this video covers the following topics:
- train detection sections in overlaps
- detection of points in overlaps
- Time of Operation Locking. -
GB Mainline Signalling Part 2, Module 9: Diamonds,Trap&Flank Protection(English)
Module 9 of GB Mainline Signalling Part 2: diamond crossings, trap and flank protection.
Through the medium of animation with voice-over, this video covers the following topics:
- trap protection
- flank protection
- diamond crossings. -
GB Mainline Signalling Part 2, Module 10: Reminders&TechnicianControls (English)
Module 10 of GB Mainline Signalling Part 2: reminder devices and technician's controls.
Through the medium of animation with voice-over, this video covers the following topics:
- What are reminder devices?
- Types of reminder device
- What are technician's controls?
- Types of technician's controls. -
GB Mainline Signalling Part 2, Module 11: Signal Groups (English)
Module 11 of GB Mainline Signalling Part 2: signal groups.
Through the medium of animation with voice-over, this video covers the following topics:
- Signal Group Replacement Controls (SGRCs)
- Predetermined Overrun Protection (POP) groups. -
GB Mainline Signalling Part 2, Module 12: Revision (English)
Module 12 of GB Mainline Signalling Part 2: Revision.
Through the medium of animation with voice-over, this video summarizes part 2 of Cōnsilium Aquīs Sulis's course on GB Mainline Signalling.