Live stream preview

Next video will start in 30 seconds

GB Mainline Signalling Part 2, Module 6: Directional Controls (English)

Close Open

GB Mainline Signalling Part 2, Module 5: Approach Locking&Route Release(English)

GB Mainline Signalling Part 2 • 6m 44s

Up Next in GB Mainline Signalling Part 2

  • GB Mainline Signalling Part 2, Module...

    Module 6 of GB Mainline Signalling Part 2: directional controls.
    Through the medium of animation with voice-over, this video covers the following topics:
    - bi-directional lines
    - establishing direction
    - bi-directional automatic sections
    - re-enforced locking.

  • GB Mainline Signalling Part 2, Module...

    Through the medium of animation with voice-over, this video covers the following topics:
    - locking overlaps
    - swinging overlaps
    - release of overlaps
    - phantom overlaps.

  • GB Mainline Signalling Part 2, Module...

    Module 8 of GB Mainline Signalling Part 2: overlap detection and Time of Operation Locking.
    Through the medium of animation with voice-over, this video covers the following topics:
    - train detection sections in overlaps
    - detection of points in overlaps
    - Time of Operation Locking.