Live stream preview
GB Mainline Signalling Part 2, Module 8: Overlap Detection & TOOL (English)
4m 2s
Module 8 of GB Mainline Signalling Part 2: overlap detection and Time of Operation Locking.
Through the medium of animation with voice-over, this video covers the following topics:
- train detection sections in overlaps
- detection of points in overlaps
- Time of Operation Locking.