Live stream preview
GB Mainline Signalling Part 2, Module 11: Signal Groups (English)
2m 59s
Module 11 of GB Mainline Signalling Part 2: signal groups.
Through the medium of animation with voice-over, this video covers the following topics:
- Signal Group Replacement Controls (SGRCs)
- Predetermined Overrun Protection (POP) groups.