Live stream preview

GB Mainline Signalling Part 3 Module 2 Lockout Devices (English)

GB Mainline Signalling Part 3 • 5m 45s

Up Next in GB Mainline Signalling Part 3

  • GB Mainline Signalling Part 3 Module ...

    Through the medium of animation with voice-over, this video covers the following topics:
    - what is shunting
    - shunting in depots and sidings
    - shunting on the main line
    - ground frames.

  • GB Mainline Signalling Part 3 Module ...

    Through the medium of animation with voice-over, this video covers the following topics:
    - what is a slot
    - slots between adjacent signalling control areas
    - slots for level crossings
    - shunter’s releases.

  • GB Mainline Signalling Part 3 Module ...

    Through the medium of animation with voice-over, this video covers the following topics:
    - what is Automatic Route Setting (ARS)
    - ARS sub areas
    - Train Operated Route Release (TORR).