GB Mainline Signalling Part 2

Educational videos on railway signalling, as implemented on mainline railways in Great Britain. Following on from GB Mainline Signalling Part 1, available free-to-view at consiliumaquissulis.com/training, this Part 2 course explains the following topics through the medium of animation with voice-over:
- points locking,
- route locking,
- displaying a proceed aspect,
- approach locking,
- route release,
- directional controls,
- overlap locking,
- overlap detection,
- Time of Operation Locking,
- diamond crossings,
- trap protection,
- flank protection,
- reminder devices,
- technician's controls,
- signal groups.

  • GB Mainline Signalling Part 2, Module 1: Introduction (English)

    1m 35s — 1 text track

    Through the medium of animation with voice-over, this video introduces part 2 of Cōnsilium Aquīs Sulis's course on GB Mainline Signalling.

  • GB Mainline Signalling Part 2, Module 2: Points Locking (English)

    5m 50s — 1 text track

    Module 2 of GB Mainline Signalling Part 2: points locking.
    Through the medium of animation with voice-over, this video covers the following topics:
    - point key requests
    - route locking of points
    - points deadlocking
    - foul track locking

  • GB Mainline Signalling Part 2, Module 3: Route Locking (English)

    6m 20s — 1 text track

    Module 3 of GB Mainline Signalling Part 2: route locking.
    Through the medium of animation with voice-over, this video covers the following topics:
    - route requests
    - testing points free to move
    - testing opposing locking
    - setting a route and applying route locking.

  • GB Mainline Signalling Part 2, Module 4: Proceed Aspect (English)

    4m 41s — 1 text track

    Module 4 of GB Mainline Signalling Part 2: displaying a proceed aspect.
    Through the medium of animation with voice-over, this video covers the following topics:
    - displaying a proceed aspect for a route
    - disengagement and automatic working
    - automatic signals
    - signal replacement.

  • GB Mainline Signalling Part 2, Module 5: Approach Locking&Route Release(English)

    6m 44s — 1 text track

    Module 5 of GB Mainline Signalling Part 2: approach locking and route release.
    Through the medium of animation with voice-over, this video covers the following topics:
    - cancelling a route
    - application of approach locking
    - approach locking release
    - sectional route release
    - anti-bob protection.

  • GB Mainline Signalling Part 2, Module 6: Directional Controls (English)

    4m 29s — 1 text track

    Module 6 of GB Mainline Signalling Part 2: directional controls.
    Through the medium of animation with voice-over, this video covers the following topics:
    - bi-directional lines
    - establishing direction
    - bi-directional automatic sections
    - re-enforced locking.

  • GB Mainline Signalling Part 2, Module 7: Overlap Locking (English)

    7m 56s — 1 text track

    Through the medium of animation with voice-over, this video covers the following topics:
    - locking overlaps
    - swinging overlaps
    - release of overlaps
    - phantom overlaps.

  • GB Mainline Signalling Part 2, Module 8: Overlap Detection & TOOL (English)

    4m 2s — 1 text track

    Module 8 of GB Mainline Signalling Part 2: overlap detection and Time of Operation Locking.
    Through the medium of animation with voice-over, this video covers the following topics:
    - train detection sections in overlaps
    - detection of points in overlaps
    - Time of Operation Locking.

  • GB Mainline Signalling Part 2, Module 9: Diamonds,Trap&Flank Protection(English)

    4m 47s — 1 text track

    Module 9 of GB Mainline Signalling Part 2: diamond crossings, trap and flank protection.
    Through the medium of animation with voice-over, this video covers the following topics:
    - trap protection
    - flank protection
    - diamond crossings.

  • GB Mainline Signalling Part 2, Module 10: Reminders&TechnicianControls (English)

    7m 23s — 1 text track

    Module 10 of GB Mainline Signalling Part 2: reminder devices and technician's controls.
    Through the medium of animation with voice-over, this video covers the following topics:
    - What are reminder devices?
    - Types of reminder device
    - What are technician's controls?
    - Types of technician's controls.

  • GB Mainline Signalling Part 2, Module 11: Signal Groups (English)

    2m 59s — 1 text track

    Module 11 of GB Mainline Signalling Part 2: signal groups.
    Through the medium of animation with voice-over, this video covers the following topics:
    - Signal Group Replacement Controls (SGRCs)
    - Predetermined Overrun Protection (POP) groups.

  • GB Mainline Signalling Part 2, Module 12: Revision (English)

    7m 50s — 1 text track

    Module 12 of GB Mainline Signalling Part 2: Revision.
    Through the medium of animation with voice-over, this video summarizes part 2 of Cōnsilium Aquīs Sulis's course on GB Mainline Signalling.

  • GB Mainline Signalling Part 2

    12 videos

    Educational videos on railway signalling, as implemented on mainline railways in Great Britain. Following on from GB Mainline Signalling Part 1, available free-to-view at consiliumaquissulis.com/training, this Part 2 course explains the following topics through the medium of animation with voice...

  • ETCS Part 2

    12 videos

    Educational videos on the European Train Control System (ETCS), part of the European Rail Traffic Management System (ERTMS). Following of from ETCS Part 1, available free-to-view at consiliumaquissulis.com/training, this Part 2 course explains the following ETCS topics through the medium of sile...

  • Introducción de nuevas tecnologías

    7 videos

    Vídeos educativos sobre cómo introducir nuevas tecnologías en un entorno comercial. A través de la animación silenciosa, aprenda sobre
    - estrategia técnica,
    - investigación y evaluación comparativa,
    - evaluaciones de viabilidad,
    - gestión de requisitos,
    - gestión de la seguridad,
    - fiabilidad, di...